Development Projects

1 Oct 2010– 30 Sep 2013

ADVANCE is a three year project (01.10.2010-30.09.2013) co-financed by the European Commission’s Seventh Research Framework Programme under the Intelligent Information Management objective.
The main objective of the project is to provide collaborative communities or networked enterprises, primarily logistics networks, with a solution platform which enables them to improve their operations through analysis of operational data, decision support and network-wide sharing of otherwise locally constrained information.

1 Sep 2010– 31 Mar 2013

The PC glasses contain the computer in a case with sunshield form which does not obstruct the view. There is a simplified user interface on its upper shield with four buttons for paging, searching and switching books, films and files stored in the memory. The display units located below the eye-level present a distant and large-size virtual image in the bottom part of the field of vision. The image can be viewed by glancing downwards at a comfortable reading angle; therefore, the horizontal view has no obstacle.

1 Jul 2010– 31 Jul 2013

The project “Quantifiable Closed Quality Control” (QC)² deals with the identification and development of improved structures and methods, which enable SME to control their activities concerning process and product quality issues.
Process quality addresses the minimization of all non-value adding processes in the value chain from order processing to production itself..

1 Jul 2010– 30 Sep 2012

The SHIWA project's main goal is to leverage existing workflow based solutions and enable cross-workflow and inter-workflow exploitation of DCIs by applying both coarse- and fine-grained strategies.

The coarse-grained (CG) approach enables to combine workflows written in different workflow languages in order to reuse existing reuse and combine existing workflow applications written in various workflow languages. The CG approach treats existing workflows as black box systems that can be incorporated into other workflow applications as workflow nodes.

1 Jun 2010– 31 May 2012

EDGI will develop middleware that consolidates the results achieved in the EDGeS project concerning the extension of Service Grids with Desktop Grids (DGs) in order to support European Grid Initiative (EGI) and National Grid Initiative user communities that are heavy users of Distributed Computing Infrastructures (DCIs) and require an extremely large number of CPUs and cores. EDGI will go beyond existing DCIs that are typically cluster Grids and supercomputer Grids, and will extend them with public and institutional Desktop Grids and Clouds.

1 Jun 2010– 31 May 2012

The FP7 EDGeS project has successfully set up a production-level distributed computing infrastructure (DCI) consisting of more than 100.000 PCs from several volunteer and low-cost Desktop Grids, which have been connected to existing Service Grids (including EGEE, SEE-GRID, etc. with about 150.000 processors) based on the new 3G Bridge technology and application development methodology.

1 May 2010– 31 Dec 2012

The CrossMedia e-science platform supports collaborative research communities by providing a comfortable solution to jointly develop semantic- and media search algorithms on common and challenging datasets processed by novel feature extractors. Users form communities on the CrossMedia portal where they can jointly create, build and share search algorithms and media datasets in an iterative way.

1 May 2010– 31 May 2011

The aim of the KOPI-Trans project is to create algorithms that enable locating and finding English translations of a Hungarian text, either on the internet, in digital libraries or collections. Finding translations is a yet to-be-solved problem on international level as well, even between English and German which are languages spoken by many, however finding a solution to it would mean a great advance in several fields.

1 Jan 2010– 31 Dec 2011

DSD cooperates with Nuance to design and implement web services built on Nuance technologies in a cloud environment. The project targets the production of high availability, elastic components, which will be able to serve individuals as well as high profile business partners of Nuance.

4 Mar – 31 Oct