- Mária Prill, Ph.D., senior research fellow
- Address: 1111 Budapest, Lágymányosi u. 11.
Room number: L 515
Phone: +36 1 279 6122
Fax: +36 1 209 5267
E-mail: prill.maria@sztaki.mta.hu
Department: Research Group of Operations Research and Decision Systems
Publications
[order by time] [order by categories ]2005.
- Game theoretic models for climate change negotiations
- Authors: Forgó, F.; Fülöp, János; Prill, M.
Date: 2005.
Published by: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (Page: 2)
2002.
- Game theoretic models for climate change negotiations. (Working paper of the Laboratory of Operations Research and Decision Systems (LORDS) WP 2002-3)
- Authors: Forgó, F.; Fülöp, János; Prill, M.
Date: 2002.
Published by: Game theoretic models for climate change negotiations. (Working paper of the Laboratory of Operations Research and Decision Systems (LORDS) WP 2002-3)
2001.
- GHGAME: An Excel add-in for computation with game theoretic models. ( Working paper of the Laboratory of Operations Research and Decision Systems, (LORDS) WP 2001-13.)
- Authors: Forgó, F.; Fülöp, János; Prill, M.
Date: 2001.
Published by: GHGAME: An Excel add-in for computation with game theoretic models. ( Working paper of the Laboratory of Operations Research and Decision Systems, (LORDS) WP 2001-13.)
2000.
- Linearized segmentation method for probabilistic production cost simulation
- Authors: Fülöp, János; Prill, M.
Date: 2000.
Published by: INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS (Page: 4)
1998.
- The linearized segmentation method for probabilistic cost simulation. (Working paper of the Laboratory of Operations Research and Decision Systems, (LORDS) WP 98-14.)
- Authors: Fülöp, János; Prill, M.
Date: 1998.
Published by: The linearized segmentation method for probabilistic cost simulation. (Working paper of the Laboratory of Operations Research and Decision Systems, (LORDS) WP 98-14.)
1996.
- Tartalék kapacitás tervezése villamosenergia-termelő rendszerekben.(Working paper of the Laboratory of Operations Research and Decision Systems, (LORDS) WP 97-7.)
- Authors: Prill, M.
Date: 1996.
Published by: Tartalék kapacitás tervezése villamosenergia-termelő rendszerekben.(Working paper of the Laboratory of Operations Research and Decision Systems, (LORDS) WP 97-7.)
- On the models of peak load forecast uncertainty in probabilistic production costing algorithms
- Authors: Hoffer, J.; Prill, M.
Date: 1996.
Published by: INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS (Page: 1)
- Long-run marginal cost calculation for electricity tariff preparation in Hungary
- Authors: Kacsó, A.; Prill, M.
Date: 1996.
Published by: Global energy transitions with emphasis on the last five years of the century. Conference proceedings. 19th IAEE international conference. Budapest, 1996. (Page: 2)
1995.
- Sensitivity analysis of the reliability measures taking into account the peak load forecast uncertainty in power system production planning. (Working paper of the Laboratory of Operations Research and Decision Systems (LORDS) WP 95-1.)
- Authors: Hoffer, J.; Prill, M.
Date: 1995.
Published by: Sensitivity analysis of the reliability measures taking into account the peak load forecast uncertainty in power system production planning. (Working paper of the Laboratory of Operations Research and Decision Systems (LORDS) WP 95-1.)
1994.
- The effect of peak load forecast uncertainty on reliability measures in power system production planning
- Authors: Hoffer, J.; Prill, M.
Date: 1994.
Published by: ECMI 94. 8th conference of the European Consortium for Mathematics in Industry. Abstracts. Kaiserslautern, 1994 (Page: 3)
1992.
- On the models of peak load forecast uncertainty in probabilistic production costing algorithms (Working paper of the Laboratory of Operations Research and Decision Systems (LORDS) WP 92-13)
- Authors: Hoffer, J.; Prill, M.
Date: 1992.
Published by: On the models of peak load forecast uncertainty in probabilistic production costing algorithms (Working paper of the Laboratory of Operations Research and Decision Systems (LORDS) WP 92-13)