Jump to content

EU Centre of ExcellenceISO 9001

ERCIMW3C MemberFraunhofer Project Center

András Kovács, Ph.D., senior research fellow
András Kovács
Address: 1111 Budapest, Kende u. 13-17.
Mail address: 1111 Budapest, Kende u. 13-17, Hungary
Room number: K416
Phone: +36 1 279 6299
Fax: + 36 1 466 7503
E-mail: kovacs.andrasEZT_TOROLJE_KI@EZT_TOROLJE_KIsztaki.mta.hu
Homepage: http://www.sztaki.hu/~akovacs/
Department: Research Laboratory on Engineering & Management Intelligence

Research interests:
Modeling and solving optimization problems in the field of production and logistics, production planning and scheduling, constraint programming, combinatorial optimization

Publications

[order by time] [order by categories ]

machine scheudling

The interval flow shop model
Authors: Kis, Tamás; Drótos, Márton; Erdős, Ferenc Gábor; Kovács, András
Editor: Jozefowska, J; Weglarz, J
Date: 2006.
Published by: PMS 2006. Tenth international workshop on project management and scheduling. Poznan, 2006. (Page: 2)
Single-machine scheduling with tool changes: a constraint-based approach

Publication without a category

A global constraint for total weighted completion time
Authors: Kovács, András; Beck, J. Christopher
Date: 2007.
Published by: CPAIOR 2007. Integration of AI and OR techniques in constraint programming for combinatorial optimization problems. 4th international conference. Brussels, 2007. (Lecture notes in computer science 4510.) (Page: 1)
An Efficient MIP Formulation for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups
Authors: Kovács, András; Brown, KN; Tarim, SA
Date: 2006.
Published by: 14th International Symposium on Inventories
Extensions of the COMPLETION constraint
Authors: Kovács, András; Beck, J. Christopher
Date: 2007.
Published by: COLPAS`07: CP/ICAPS 2007 joint workshop on constraint satisfaction techniques for planning and scheduling problems. Providence, 2007. (Page: 1)
Constraint-based scheduling with total completion time criterion: models and applications
An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
Authors: Kovács, András; Brown, K. N.; Tarim, S. A.
Date: 2009.
Published by: International Journal of Production Economics (Page: 2)
Optimizing the Storage Assignment in a Warehouse Served by Milkrun Logistics
Authors: Kovács, András
Date: 2008.
Published by: 15th International Symposium on Inventories
Novel models and algorithms for integrated production planning and scheduling
Authors: Kovács, András
Date: 2006.
Progressive solutions: a simple but efficient dominance rule for practical RCPSP
Authors: Kovács, András; Váncza, József
Date: 2006.
Published by: Lecture Notes in Computer science (Page: 1)
Real-time, cooperative enterprises: management of changes and disturbances on different levels of production
Authors: Monostori, László; Váncza, József; Márkus, A.; Kis, Tamás; Kovács, András; Erdős, P.; Kádár, Botond; Viharos, Zsolt János
Date: 2005.
Published by: 38th CIRP international seminar on manufacturing systems. Florianópolis, 2005. (Page: 1)
Structural exploration of constraint-based scheduling problems
Authors: Kovács, András; Márkus, A.; Váncza, József
Date: 2005.
Published by: CIRP JOURNAL OF MANUFACTURING SYSTEMS (Page: 2)
Proterv-II: an integrated production planning and scheduling system
Authors: Kovács, András; Egri, Péter; Kis, Tamás; Váncza, József
Date: 2005.
Published by: LECTURE NOTES IN COMPUTER SCIENCE
Project-oriented approach to production planning and scheduling in make-to-order manufacturing
Authors: Egri, Péter; Kovács, András; Márkus, A.; Váncza, József
Date: 2005.
Published by: PRODUCTION SYSTEMS AND INFORMATION ENGINEERING (Page: 2)
Real-time, cooperative enterprises: management of changes and disturbances in different levels of production
Authors: Monostori, László; Váncza, József; Márkus, András; Kis, Tamás; Kovács, András; Erdős, Ferenc Gábor; Kádár, Botond; Viharos, Zsolt János
Date: 2006.
Published by: CIRP Journal of Manufacturing Systems (Page: 3)
Integrált termeléstervezés és ütemezés megrendelésre történő gyártásban
Authors: Kovács, András; Egri, Péter; Váncza, József
Date: 2005.
Published by: GÉPGYÁRTÁS (Page: 4)
On bilevel machine scheduling problems
Authors: Kis, Tamás; Kovács, András
Editor: Stein, C.; Uetz, M.; Vredeveld, T.
Date: 2009.
Published by: MAPSP 2009. 9th workshop on models and algorithms for planning and scheduling problems. Abbey Rolduc, 2009. (CTIT proceedings WP 09-11.) (Page: 1)
An Efficient MIP Model for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups
Authors: Kovács, András; Brown, Kenneth N.; Tarim, S. Armagan
Date: 2009.
Published by: International Journal of Production Economics (Page: 2)
A global constraint for total weighted completion time for unary resources
Authors: Kovács, András; Beck, J. C.
Date: 2011.
Published by: Constraints (Page: 1)
A system for the detailed scheduling of wind farm maintenance
WindMT: An integrated system for failure detection and maintenance scheduling at wind farms
Authors: Kovács, András; Csempesz, János; Erdős, Ferenc Gábor; Karnok, Dávid; Kemény, Lőrinc; Monostori, László; Viharos, Zsolt János
Date: 2011.
Published by: ICAPS 2011. 21st international conference on automated planning and scheduling. Proceedings of system demonstrations. Freiburg, 2011. (Page: 4)
Scheduling the maintenance of wind farms for minimizing production loss
Authors: Kovács, András; Erdős, Ferenc Gábor; Monostori, László; Viharos, Zsolt János
Date: 2011.
Published by: Preprints of the 18th IFAC World Congress. Milano, 2011. (Page: 1)
Constraint programming approach to a bilevel scheduling problem
Authors: Kovács, András; Kis, Tamás
Date: 2011.
Published by: Constraints (Page: 3)
Optimizing the storage assignment in a warehouse served by milkrun logistics
Authors: Kovács, András
Date: 2011.
Published by: International Journal of Production Economics (Page: 3)
Approaches to inventory management in supply chains: a comparative study
Authors: Kovács, András; Egri, Péter; Kis, Tamás; Váncza, József
Date: 2010. 08. 23.
Published by: In Proc. of the 16th International Symposium on Inventories
Exploiting repetitive patterns in practical scheduling problems
Authors: Kovács, András; Váncza, József
Editor: Sihn, W.; Kuhlang, P.
Date: 2010. 05. 26.
Published by: 43rd CIRP international conference on manufacturing systems. Sustainable production and logistics in global networks. Proceedings. Vienna, 2010. (Page: 8)
AI supported maintenance and reliability system in wind energy production
Authors: Monostori, László; Viharos, Zsolt János; Erdős, Ferenc Gábor; Kovács, András
Editor: Burczynski, T.; Cholewa, W.; Moczulski, W.
Date: 2009.
Published by: AI-METH 2009. Artificial intelligence methods. Symposium proceedings. Gliwice, 2009. (AI-METH series.)
Constraint programming approach to a bilevel scheduling problem
Authors: Kovács, András; Kis, Tamás
Editor: Salido, M. A.; Barták, R.
Date: 2009.
Published by: COPLAS 2009. Proceedings of the workshop on constraint satisfaction techniques for planning and scheduling problems. Thessaloniki, 2009. (Page: 1)
Digital enterprise solution for integrated production planning and control
Authors: Monostori, László; Erdős, Ferenc Gábor; Kádár, Botond; Kis, Tamás; Kovács, András; Pfeiffer, András; Váncza, József
Date: 2010.
Published by: Computers in Industry (Page: 1)
AI supported maintenance and reliability system in wind energy production
Authors: Viharos, Zsolt János; Monostori, László; Erdős, Ferenc Gábor; Kovács, András
Date: 2010. 04. 20.
Published by: EWEC 2010. European wind energy conference and exhibition. Warsaw, 2010. (Page: 1)
Artificial intelligence applications for maintenance oriented health monitoring of wind turbines
Authors: Viharos, Zsolt János; Erdős, Ferenc Gábor; Kovács, András; Monostori, László
Date: 2010. 05. 25.
Published by: Gépészet 2010. Proceedings of the 7th conference on mechanical engineering. Budapest, 2010. (Page: 4)
A cutting plane approach for integrated planning and scheduling
Authors: Kis, Tamás; Kovács, András
Date: 2012.
Published by: Computers and Operations Research (Page: 3)

New search